Gateway 2 Design

The Building Safety Act 2022 introduced a new, rigorous three-gateway approval process for Higher-Risk Buildings (HRBs). Gateway 2 is the crucial stage where building control approval must be secured before construction can begin.

smoke control
smoke control

Gateway 2 compliant designs

For developers and architects, Gateway 2 means that all life safety systems, including smoke control, must be fully designed, documented, and proven to be compliant at the planning stage.

What is Gateway 2?

Gateway 2 is the “planning application” stage for building safety. Managed by the Building Safety Regulator (BSR), it requires a comprehensive submission that demonstrates a building will be safe throughout its entire lifecycle.

For a smoke control system, this is no longer about intent; it is about proving performance in advance. You cannot proceed to construction without passing this gateway. See more on the government website and Building Safety Act.

The Gateway 2 Submission: What You Need for Smoke Control

Your submission must move from concept to certainty. The BSR will require clear, evidence-based documentation for your smoke control strategy, including:

  • Detailed Design & Installation Drawings: Pre-construction drawings that specify exactly what will be installed, where, and how.
  • CFD (Computational Fluid Dynamics) Analysis: Computer simulations that prove your smoke control system will effectively manage smoke and maintain tenable conditions in escape routes and firefighter access areas under various fire scenarios.
  • Comprehensive Technical Reports: Documents that outline the design philosophy, performance criteria, and compliance with relevant standards (BS 9999, BS EN 12101, etc.).
  • Commissioning & Handover Plans: A clear plan for how the system will be tested and commissioned, and the information that will be provided to the “Accountable Person” at Gateway 3 (handover).
Basement ventilation system, smoke control system, smoke control system installation
smoke control

The Consequences of Getting it Wrong

Failure to provide a robust, evidence-backed submission at Gateway 2 leads to:

  • Application Rejection: The BSR will not grant permission to build, causing significant project delays.
  • Costly Redesign: Rushing to create compliant documentation after a rejection is far more expensive and time-consuming than doing it right the first time.
  • Legal & Financial Risk: As the “Principal Designer” and “Principal Contractor” roles now carry legal responsibility for safety, an inadequate submission carries substantial personal and corporate risk.

How Delta Smoke Control Ensures Your Gateway 2 Submission Succeeds

 

Our Gateway 2 support package includes:

  • Expert System Design: Designs are developed in line with the relevant standards – BS9999, BS9991 and the Smoke Control Association guidance.
  • Certified CFD Analysis: We partner with specialists to produce the computational fluid dynamics reports that prove your system’s performance.
  • Complete Documentation Pack: We provide the detailed drawings, specifications, and technical reports required for your BSR submission.
  • Collaborative Partnership: We work directly with your architects and principal designers to ensure the smoke control strategy is seamlessly integrated into the overall building design.

Don't let Gateway 2 become a roadblock
Partner with the specialist team at Delta who understands the new regulations.

Contact Us for a Gateway 2 Consultation

Designing

Our experienced design team work to create a smoke control system that works perfectly for your unique circumstances.

Installing

We work with you to fit into your schedule - minimising disruption. We are organised, punctual and easy to work with.

Commissioning

We commission smoke control systems by carrying out robust testing that checks the systems work properly together and that it delivers the performance that it is designed for.

Maintaining

We conduct a thorough schedule of testing and maintenance to maximise year-round system performance.